Slab to steel to finish, done right.

Metal buildings, detached garages, workshops, pole barns, and agricultural structures across Longview and East Texas. I pour for the clay, then raise the steel.

One contractor, start to finish

Most metal-building jobs go wrong at the handoffs. One guy pours the slab, another raises the steel, nobody owns the finish. I do it all. Site prep, slab, steel erection, and the interior finish so the building actually works when I'm done. No finger-pointing between subs when the door doesn't clear the slab.

East Texas clay is the wildcard and most crews treat it like Kansas dirt. It isn't. Our clay expands and contracts with every wet-dry cycle, and a slab that ignores that cracks, heaves, and takes the building with it. I pour for the ground we're actually standing on, not a catalog spec. Get the slab right and everything above it is easier. Get it wrong and it doesn't matter how pretty the steel is.

What the ground demands

On expansive clay you want a slab engineered to handle movement. That means proper footings, a thickened edge, sometimes post-tension or a reinforced mat depending on span and load. For a 40 by 80 shop in Gladewater, the footer question isn't "how cheap" but "will it still be level in five years." I've seen post barns where the owner skipped the footing advice and spent more fixing the lean than the slab would have cost. The foundation is the whole job. Treat it like it.

Wind matters here too. East Texas gets straight-line winds and the occasional storm that doesn't care about your permit. I build to the local wind-load requirement, not the bare minimum the salesman quoted. A building that loses a wall in the first bad storm wasn't a deal, it was a bill you hadn't opened yet.

What we build

  • Detached garages and workshops
  • Metal shops and pole barns
  • Agricultural and equipment storage buildings
  • Commercial and light-industrial PEMB structures
  • Slab, erection, and interior finish, one schedule

Questions owners actually ask me

Do you do the concrete too?

Yes. I pour the slab myself or with a concrete partner I manage. One schedule, one responsible party. You're not the referee between the dirt guy and the steel guy.

Can you match an existing building?

I'll match profile, color, and finish to your existing structures so the property stays consistent. Bring me a picture and I'll match it.

How long does it take?

Depends on size and finish, but I give you a real date up front and hold it. Weather and cure time are the honest variables, and I'll tell you about both before we start.

What does it cost?

Varies with size, finish, and site prep. I scope it with you. What I won't do is quote low to win it and make it up on change orders.